top of page

2. Infrastructure Development 

GCS-utility mapping- royal guard of oman, sultan palace 230.jpg

Utility Mapping:

Royal Guard of Oman, Sultan Palace

Client: Royal Guard of Oman

Location: Sultan Da Bous Palace – Oman

Area: 88, 000 m²

 

Scope Of Work

Having carried out the detailed survey, Technics was able to compare the GPR data and evidence from boreholes, which included optic fiber cables, water pipelines and sewerage. Analysis of the GPR data revealed the positions of a series of probable structures. The results enable the Client to undertake planned works with prior knowledge that will allow them to minimize damage.

GCS-utility mapping- royal guard of oman, sultan palace 231.jpg
  • White Facebook Icon
  • White Instagram Icon
  • YouTube
United Kingdom HQ :

1st Floor One Mayfair, 
Place Devonshire House Mayfair 
W1J 8AJ

T:  +44 (0) 207 268 4840
F:  +44 (0) 1202 313 601
M: +44 7472 447214

GET IN TOUCH

© 2022 by Global Construction Solutions. Proudly created by tasmimzone 

bottom of page