INFRASTRUCTURE DEVELOPMENT

12d Model: Burj Khalifa Tower and Dubai Mall
Client Emaar Properties Location Dubai – United Arab Emirates (UAE) Project Value $1.5 Billion Background Burj Khalifa Construction of the Burj Khalifa began in 2004,

12d Model: Westfield Shopping Centre
“Our leak detection services – It’s non-destructive. We use advanced techniques and equipment to detect the leaks; we’ll find the leak without doing any damage

Utility Mapping: Boushar Access Roads
Client: Muscat Municipality Location: Muscat – Boushar Area: 10, 000 m2 Utility Mapping provides utility locating, mapping, non-destructive digging and survey solutions to a wide

12d Model: Ferrari world Abu Dhabi
Project Description: The scale of the project covered a retail mall, with a built-up area of over 300,000 m², 4 multi-storey car parks, 2 4/5

Utility Mapping: Residential Development
Client Merry Hill Real Estate Developer Location Merry Hill – United Kingdom Area : Underground Utility 10 Ha Background Merry Hill The survey was undertaken

12d Model: Dapto Race Track
Designer: Dalton Consulting Engineers Client: Dapto Showground Location: Dapto, NSW, Australia Outline: Dalton Consulting Engineers (DCE) has combined its engineering and 12d skills to grow

Utility Mapping: Muscat Airport Assessment
Client: Oman Aviation Group Location: Muscat  The surveys were undertaken to follow the client’s service protection process and mitigate the risk of damaging services

Utility Mapping: Rahayel Project
Client KEO Consultant Location Abu Dhabi – United Arab Emirates (UAE) Area : Utility Mapping 4km Scope of Work GCS was commissioned to undertake an

Utility Mapping: Royal Guard of Oman, Sultan Palace
Client: Royal Guard of Oman Location: Sultan Da Bous Palace Area: 80, 000 m2 Having carried out the detailed survey, Technics was able to compare