Client
Olympics Delivery Authority
Location
South West England
Infrastructure Design
Makram Jaibaji
“Our leak detection services – It’s non-destructive. We use advanced techniques and equipment to detect the leaks; we’ll find the leak without doing any damage to your property.”
Atif Rehman
Previous
Next
London 2012 Olympics Master Plan Infrastructure Development
Location
In order to ensure the site would have flexibility for the future, the site design needed to be suitable for both large crowds attending the Olympics and for the smaller number of visitors to the site in the years following the games. During the planning of the central Olympic precinct, attention was given to ensure that the large areas of public domain required for the safe and comfortable passage daily of over 250,000 spectators could be reduced to provide a more intimate environment for future legacy developments.